Client at a glance

Client
Lakes Grammar School
Location
Warnervale, NSW
Completion date
2016
System size
100kW

Schools in regional Australia are leading the charge in switching to solar power. Autonomous Energy has just completed the delivery of a turnkey 100kW commercial scale solar power system for Lakes Grammar School in regional NSW. Lakes Grammar School is delighted to have slashed its ongoing electricity costs and carbon footprint with this large scale solar power initiative.

Autonomous Energy solution

  • The system was designed and installed by Autonomous Energy’s in-house solar engineering and installation teams.
  • The system features 350 LG monocrystalline solar modules. These high efficiency panels offer a great visual appearance along with high quality and a 25 year product warranty.
  • SMA Tripower inverters and Schletter mounting equipment were also used.
  • An online solar data monitoring system has been established, providing real time solar performance information for school students and the school community to interact with.
  • Autonomous Energy’s solar engineering team also use the online solar data monitoring system for remote performance monitoring, ensuring  the system  has minimal (if any) downtime and is always performing at its full potential, providing the client with the highest possible yield and return on investment.

Client at a glance

Client
Lakes Grammar School
Location
Warnervale, NSW
Completion date
2016
System size
100kW

Questions? Call us on 1800 314 759

We'd love to hear from you