Great to see Sydney Airport’s new solar car park up and running. Installed on the 12th storey of the northern carpark at the international terminal, our solution involved a custom designed and built structure that resulted in the ability to safely install a much larger PV system than would be possible with an ‘off the shelf’ solution. Notably we installed 45 tonnes of steel, 25.2 tonnes of aluminium, 1800 special low reflectivity PV modules and an integrated LED car park lighting system. Hats off to Autonomous Energy’s engineering and installation teams, Lend Lease and Sydney Airport for working so well together in delivering this innovative clean energy solution.
 

    Questions? Call us on 1300 797 652

    We'd love to hear from you